Stewart 51 Hangar

Building Planes That Don't Look Like The Box They Came In

  • The Airplane Builder
  • S-51 Info
    • S-51 Specs
    • S-51 Build Tips
    • S-51 Build Costs
  • S-51 Build Log
  • F1 Rocket Hangar
  • About
    • Disclosure
  • Resources
  • Ask Mike|Contact

Left Elevator Trim Motor Bracket Work

December 23, 2020 by admin Leave a Comment

Tonight I got some prep work done on the left elevator trim motor bracket for mounting the cover plate nutplates and dimpling the assembly. I had previously located the nutplate holes around the opening to attach the access panel. In the image below is the motor and supports that will get riveted to the access […]

Left Elevator Assembly and Hinge Brackets

December 15, 2020 by admin Leave a Comment

Today I’m continuing with the assembly of the left elevator. Before I get to riveting there is a bit of work that is still required on this elevator. Most notably is building the trim tab, however before I get there I need to do some more work to final size all the rivet holes and […]

Right elevator skin drilling and prepwork

September 3, 2020 by admin Leave a Comment

As the right elevator is starting to come together, today I started by looking at some of the remaining parts to begin planning ahead, in particular, the leading edges and balance weight assembly. The leading edge skins needed to be trimmed to length, so I started with the layout. This was a bit tricky as […]

Right Elevator Spar Riveting

August 31, 2020 by admin Leave a Comment

Finally I’m starting to get some visual progress on the right elevator. Today I began by prepping and priming the elevator spar parts. View Post After priming I riveted the nutplates. Before I started riveting, I placed a strip of electrical tape at each of the rib locations. These won’t be riveted until a later […]

« Previous Page
Next Page »
Profile Photo 1 Hello - My name is Mike and I'm a true believer that if you can imagine something, it's just a matter of bringing it into reality.

Categories

  • Community
  • Control System
  • Elevators
  • Empennage
  • Fuselage
  • Horizontal Stabilizer
  • Landing Gear
  • Main Gear
  • Main Spar
  • Rudder
  • Tools
  • Uncategorized
  • Wings
  • Workshop

Tags

7006-8 Actuator Airplanes Are Cool Community Downlock Elevator Empennage Forks Fuselage Hinges Horizontal Stabilizer Jig Landing Gear Laser Level Lighting Main Gear Main Spar Nutplate Oshkosh Parts Parts Shipment Retract Rudder Rudder Spar Steering Box Tailwheel Throttle Quadrant Tools Trim Tab Uplock Vertical Fin Welding Wings Workbench Workshop

Copyright © 2025 · Beautiful Pro Theme on Genesis Framework · WordPress · Log in