Stewart 51 Hangar

Building Planes That Don't Look Like The Box They Came In

  • The Airplane Builder
  • S-51 Info
    • S-51 Specs
    • S-51 Build Tips
    • S-51 Build Costs
  • S-51 Build Log
  • F1 Rocket Hangar
  • About
    • Disclosure
  • Resources
  • Ask Mike|Contact

Rudder assembly – part 8 – Trim tab fine tuning

January 11, 2023 by Mike Leave a Comment

OK, fast forward about a month or so since my last post and yes, there is a lot of progress that has happened on the rudder trim tab. What I didn’t get pictures of was the drilling process of the tab to the hinge, and the hinge to the rudder. However, as you can see […]

Rudder assembly – part 7 – Trim Tab Hinge

November 5, 2022 by Mike Leave a Comment

Today I’m starting to work on the rudder trim tab hinge. I began with roughly cutting the hinge to length, then started to get it clamped in place. To help me in getting the hinge located in the ideal position, I extended the centerline of the hinge on each end. This helped me to get […]

Elevator trim tab build-up continued

March 11, 2021 by admin Leave a Comment

Today I’m continuing with building up the elevator trim tab. I’m starting by filing down the edges to get 3/32 inch clearance between the tab and the elevator. Once I got the edges filed down, I started to work on the trim tab end ribs. The S-51 plans don’t provide much detail here so I’m […]

Elevator Trim Tab

February 18, 2021 by admin Leave a Comment

Continuing with building up the elevators, today I’m going to focus on getting the trim tab hinge aligned and positioned. To begin, I used a scrap metal strip to simulate the skin. I wanted to make sure the trim tab skin is in alignment with the elevator skin surface. Below is a picture from the […]

Next Page »
Profile Photo 1 Hello - My name is Mike and I'm a true believer that if you can imagine something, it's just a matter of bringing it into reality.

Categories

  • Community
  • Control System
  • Elevators
  • Empennage
  • Fuselage
  • Horizontal Stabilizer
  • Landing Gear
  • Main Gear
  • Main Spar
  • Rudder
  • Tools
  • Uncategorized
  • Wings
  • Workshop

Tags

7006-8 Actuator Airplanes Are Cool Community Downlock Elevator Empennage Forks Fuselage Hinges Horizontal Stabilizer Jig Landing Gear Laser Level Lighting Main Gear Main Spar Nutplate Oshkosh Parts Parts Shipment Retract Rudder Rudder Spar Steering Box Tailwheel Throttle Quadrant Tools Trim Tab Uplock Vertical Fin Welding Wings Workbench Workshop

Copyright © 2025 · Beautiful Pro Theme on Genesis Framework · WordPress · Log in